C.R.F. No. 24.
KOWLOON CANTON RAILWAY.
BRITISH SECTION
ESTIMATE.
Main Head: BRIDGES.
Sub. Head: MINOR BRIDGE No.29.
Work: One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314
Item Quantity Description Rate Unit Amount 1 240 Excavation in founds. 10/ Cub. Ft. $2,400.00 2 182 Timbering and pumping. 8/ $1,456.00 3 500 Concrete in foundations. 35/- -% $3,675.00 4 13,200 Masonry in superstructure. 1,400 Masonry in Arches. 250 Masonry in coping. 3,600 Dry stone backing. 40/- -% $5,280.00 2,800 2/ 0.ft $2,800.00 500 10/- % $36.00 Total $13,273.00 Contingencies 10% $1,327.30 Grand Total $14,600.30Page 1107
...
Page 1108
is not present, hence not included.1107
00
(
Q
I
C
100
00
S
Jewlift roinnD moclwo
C.R.F. No. 24.
kowloon Canton Railway.
106
BRITISH SECTION
ESTIMATE.
Dash nigl
Main Head
Sub. Head
BRIDGES.
MINOR BRIDE No.29.
32.
Work One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314
AMOUNT.
tity.
DESCRIPTION.
Rate. Unit.
Cts.
da 240 10. 200
{
2.03
o mi
€1,16,200
Excavation in founds.
Item Timbering and pumping.
10/
*
182
00
800
0,500
Concrete in foundations.
35/-%
3,675 00
h
13,200
Masonry in superstructure.
1,400 Masonry in Arches.
250 | Masonry in coping.
3,600 Dry stone backing.
40/-% 2/0
5,280
2,800
2/ 0.ft 10/%
500
36
8 8 8 8 8 8
00
00
Σ
bef
Total
At eofchigano)
Contingincies 10%
13,273 00
1,327
30
Matol basÜ
Grand Total
14,600
30