ESTIMATE.

Main Head: BRIDGES.

Sub. Head: MINOR BRIDGE No.29.

Work: One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314

Item Quantity Description Rate Unit Amount 1 240 Excavation in founds. 10/ Cub. Ft. $2,400.00 2 182 Timbering and pumping. 8/ $1,456.00 3 500 Concrete in foundations. 35/- -% $3,675.00 4 13,200 Masonry in superstructure. 1,400 Masonry in Arches. 250 Masonry in coping. 3,600 Dry stone backing. 40/- -% $5,280.00 2,800 2/ 0.ft $2,800.00 500 10/- % $36.00 Total $13,273.00 Contingencies 10% $1,327.30 Grand Total $14,600.30

Page 1107

...

Page 1108

is not present, hence not included.

Edit History

2026-06-04 21:26:21 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C.R.F. No. 24. KOWLOON CANTON RAILWAY. BRITISH SECTION ESTIMATE. Main Head: BRIDGES. Sub. Head: MINOR BRIDGE No.29. Work: One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314 Item Quantity Description Rate Unit Amount 1 240 Excavation in founds. 10/ Cub. Ft. $2,400.00 2 182 Timbering and pumping. 8/ $1,456.00 3 500 Concrete in foundations. 35/- -% $3,675.00 4 13,200 Masonry in superstructure. 1,400 Masonry in Arches. 250 Masonry in coping. 3,600 Dry stone backing. 40/- -% $5,280.00 2,800 2/ 0.ft $2,800.00 500 10/- % $36.00 Total $13,273.00 Contingencies 10% $1,327.30 Grand Total $14,600.30 Page 1107 ... Page 1108 is not present, hence not included.
Baseline (Original)
1107 00 ( Q I C 100 00 S Jewlift roinnD moclwo C.R.F. No. 24. kowloon Canton Railway. 106 BRITISH SECTION ESTIMATE. Dash nigl Main Head Sub. Head BRIDGES. MINOR BRIDE No.29. 32. Work One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314 AMOUNT. tity. DESCRIPTION. Rate. Unit. Cts. da 240 10. 200 { 2.03 o mi €1,16,200 Excavation in founds. Item Timbering and pumping. 10/ * 182 00 800 0,500 Concrete in foundations. 35/-% 3,675 00 h 13,200 Masonry in superstructure. 1,400 Masonry in Arches. 250 | Masonry in coping. 3,600 Dry stone backing. 40/-% 2/0 5,280 2,800 2/ 0.ft 10/% 500 36 8 8 8 8 8 8 00 00 Σ bef Total At eofchigano) Contingincies 10% 13,273 00 1,327 30 Matol basÜ Grand Total 14,600 30
2026-06-04 21:26:21 · Baseline
View content

1107

00

(

Q

I

C

100

00

S

Jewlift roinnD moclwo

C.R.F. No. 24.

kowloon Canton Railway.

106

BRITISH SECTION

ESTIMATE.

Dash nigl

Main Head

Sub. Head

BRIDGES.

MINOR BRIDE No.29.

32.

Work One 15 ft Arch at chain 69" 900 Drawing C.R.E.No.314

AMOUNT.

tity.

DESCRIPTION.

Rate. Unit.

Cts.

da 240 10. 200

{

2.03

o mi

€1,16,200

Excavation in founds.

Item Timbering and pumping.

10/

*

182

00

800

0,500

Concrete in foundations.

35/-%

3,675 00

h

13,200

Masonry in superstructure.

1,400 Masonry in Arches.

250 | Masonry in coping.

3,600 Dry stone backing.

40/-% 2/0

5,280

2,800

2/ 0.ft 10/%

500

36

8 8 8 8 8 8

00

00

Σ

bef

Total

At eofchigano)

Contingincies 10%

13,273 00

1,327

30

Matol basÜ

Grand Total

14,600